PHOTOVOLTAIC STATION 1 MWp ON INDUSTRIAL ROOF – DOMOKOS FTHIOTIDA

PV power station of 1MWp capacity located οn building in Domokos Fthiotidas owned by company A.B.E.K. Nomikos. The company undertook the construction of the station in July 2012 by Conergy which had taken over the supply, the design and the study of the plant. The station is installed in six shelters of the warehouse. The equipment used consists of 4,164 panels 240W and 62 inverters. The works were completed successfully in the same month when the station was connected to the grid.

PHOTOVOLTAIC STATIONS 1 MWp – DOMOKOS FTHIOTIDA

Two PV power stations of 500 kWp capacity each located οn ground in the area of Domokos Fthiotida. The company undertook the construction of the station in January 2013 by Conergy which had taken over the supply, the design and the study of the plant. The works were completed successfully in a month when the station was connected to the grid.

PHOTOVOLTAIC STATIONS 2 MWp – LIVADIA VIOTIA

Four PV power stations of 500 kWp capacity each located οn ground in the area of Livadia Viotia. The company undertook the construction of the station in January 2013 by Conergy which had taken over the supply, the design and the study of the plant. The works were completed successfully in a month when the station was connected to the grid.

PHOTOVOLTAIC STATIONS 200 kWp WITH TRACKER – LOCATION «RAFI» DAVLIA VIOTIA

Two PV Stations with two axis tracker each having 100 kWp power in Davlia Viotia owned by ECONOISIS company. The projects were authorised in the summer of 2011 and entered the phase of construction in 2012. The company concluded a contract with LAGIE SA for the project in January 2012, with a price Feed in Tariff: 429,46 €/MWh. The stations were connected to the network of DEDDIE SA in June and December 2012 and thereafter work seamlessly.

PHOTOVOLTAIC STATION 400 kWp ON INDUSTRIAL ROOF – INDUSTRIAL AREA OF THESSALONIKI

PV Power Station with 400 kWp capacity on building roof in the Industrial Area of Thessaloniki owned by GEV GREEN ENERGY. The authorization of the project was completed the summer of 2012 and the construction began in November of that year. The station was certified by TUV Austria for its construction and was connected to the grid in January 2013. Since then it operates unhindered.

PHOTOVOLTAIC STATION 1 MWp ON INDUSTRIAL ROOF – MAGOULA ATTIKI

PV power station of 1MWp capacity located οn industrial building roofs in Magoula Attica owned by KORNILAKIS. The company undertook the construction of the station in the spring of 2012 by Conergy which had taken over the supply, the design and the study of the plant. The works were completed successfully in less than two months in June 2012 when the station was connected to the grid.

PHOTOVOLTAIC STATION 150 kWp – PAMISOS MESSINIA

PV power station of 150 kWp capacity in Pamisos Messinia. The company undertook the construction of the station by PSAROPOULOS company in December 2012. The works were completed successfully in February 2013 when the station was connected to the grid.